AGV

Completed Projects

 

ONGOING PROJECTS

Jurong Chemical Plant

Material Galvanised: Structural Steels – I-Beam Structures
Approx. Weight of Steel Galvanised: 1800 Tons


Punggol NC1 Project

Material Galvanised: Structural Steels – I-Beam Structures
Approx. Weight of Steel Galvanised: 800 Tons


Gallery Hotel

Material Galvanised: Structural Steels – I-Beam Structures
Approx. Weight of Steel Galvanised: 75 Tons


Hyflux’s Qurayyat Project

Material Galvanised: Structural Steels – Pipe Clamp and Supporting Structure
Approx. Weight of Steel Galvanised: 50 Tons


Marina One

Material Galvanised: Structural Steel – Pipe Frames and Hollows
Approx. Weight of Steel Galvanised: 2,000 tons

Marina One is a mixed-use development bounded by Marina Way and Straits View, marked by the Singapore Government as a vibrant growth area for residential, commercial and lifestyle activities. To ensure strong structural integrity against environmental corrosion, AGV galvanised about 2,000 tons of steel pipe frame and hollow structures.


Tanjong Pagar Centre

Material Galvanised: Structural Steel – I-Beams and Hollows
Approx. Weight of Steel Galvanised: 2,000 tons

The 64-storey Tanjong Pagar Centre is Singapore’s tallest skyscraper; comprising the Guoco Tower offices, retail and F&B, an urban park, a 181-unit luxury residence and the Sofitel Singapore City Centre hotel. AGV was responsible for galvanising 2,000 tonnes of steel I-beams and hollows in the building’s framing, providing maximum protection and support.


Tuas MRT Station

Material Galvanised: Structural Steel – Pipe Frames
Approx. Weight of Steel Galvanised: 300 tons

Scheduled for completion in 2016, the Tuas West Extension extends the East-West Line from Joo Koon MRT Station. The 7.5km extension comprises a twin-tracked viaduct and four above-ground stations. AGV galvanized 300 tonnes of steel pipe frames that are built to last, ensuring low maintenance for a high-traffic station that will carry 100,000 commuters daily.


HDB Telecommunication Cable Tray Laying

Material Galvanised: Structural Steel – Cable Trays, Pipes and Channels
Approx. Weight of Steel Galvanised: 600 tons

Telecommunication cable trays, pipes, and channels are costly to maintain, requiring the cables to be dug out and changed. AGV was chosen to provide galvanising services for around 600 tonnes of underground steel cable trays, pipes and channels, ensuring that the low-maintenance steel elements would create cost savings for HDB.


NTU Campus Extension

Material Galvanised: Structural Steel – Hollows
Approx. Weight of Steel Galvanised: 450 tons

In 2008, Nanyang Technological University (NTU) embarked on a planned 15-year expansion of its Yunnan Garden Campus. AGV took on the task to provide galvanising services for 450 tonnes of hollow steel used in the construction, ensuring a structurally sound building worthy of this young university.


Changi General Hospital Extension @ Simei

Material Galvanised: Structural Steel – Reinforcing Bars
Approx. Weight of Steel Galvanised: 350 tons

In constructing the extension for Changi General Hospital, AGV galvanized 350 tonnes of steel reinforcing bars, ensuring maximum safety and structural integrity for the building and its patients within.


HDB Development @ Sembawang

Material Galvanised: Structural Steel – Staircase Railings and Air Conditioner Ledges
Approx. Weight of Steel Galvanised: 1,000 tons

This next-generation, eco-friendly HDB estate will be completed over the next three years, and has been designed for lifestyle and community activities.

The key areas on which AGV focused for this project were longevity and sustainability. To support the construction of this development, AGV galvanised around 1,000 tons of staircase rails and air conditioner ledges.


The Glades Condominium @ Tanah Merah

Material Galvanised: Structural Steel – Handrails
Approx. Weight of Steel Galvanised: 150 tons

The Glades Condominium is located in the heart of an established private housing estate near Changi Business Park, East Coast Park and an upcoming university. AGV focused on low-maintenance longevity for this development. Around 150 tons of rustproof support handrails were galvanised for the project.


Singapore Armed Forces Camp

Material Galvanised: Structural Steel – Fencing Mesh & Posts
Approx. Weight of Steel Galvanised: 300 tons

To achieve maximum security for this Singapore Armed Forces camp, AGV galvanised around 300 tons of structural steel posts and security fencing, shielding national military assets from unauthorised access.